critical-path method

critical-path method
UK / US noun [singular] business
a method used in project management that shows which activities must be carried out so that the project can be completed in the shortest time and at the lowest cost

English dictionary. 2014.

Игры ⚽ Поможем написать реферат

Look at other dictionaries:

  • critical path method — ˌcritical ˈpath ˌmethod noun [countable, uncountable] another word for critical path analysis * * * critical path method UK US noun [C or U] (ABBREVIATION CPM, also critical path analysis, ABBREVIATION …   Financial and business terms

  • critical path method — critical path analysis or critical path method, a method of planning and controlling a complex operation by making a chart or diagram of the sequence of steps and time for each step required to complete the operation, often by means of a computer …   Useful english dictionary

  • critical-path method — UK US noun [singular] business a method used in project management that shows which activities must be carried out so that the project can be completed in the shortest time and at the lowest cost Thesaurus: relating to management and running a… …   Useful english dictionary

  • Critical path method — PERT chart for a project with five milestones (10 through 50) and six activities (A through F). The project has two critical paths: activities B and C, or A, D, and F – giving a minimum project time of 7 months with fast tracking. Activity E is… …   Wikipedia

  • Critical Path Method — I Critical Path Method   [Abk. CPM], Netzplantechnik. II Critical Path Method   [ krɪtikl pɑːθ meθəd, englisch], Abkürzung CPM,Netzplantechnik …   Universal-Lexikon

  • Critical Path Method — Die Methode des kritischen Pfades (auch Tätigkeits Pfeil Darstellung genannt; englisch critical path method, CPM) repräsentiert die Vorgangpfeil Netzpläne, als eine spezielle Netzplantechnik. Sie wurde 1956/57 vom amerikanischen Chemiekonzern… …   Deutsch Wikipedia

  • critical-path method — critical path analysis …   Accounting dictionary

  • critical-path method — /ˌkrɪtɪk(ə)l pɑ:θ ˌmeθəd/ noun a technique used in project management to identify the activities within a project that are critical to its success, usually by showing on a diagram or flow chart the order in which activities must be carried out so …   Marketing dictionary in english

  • Critical Path Method — ⇡ CPM …   Lexikon der Economics

  • Critical Path — may refer to: The Critical Path, the longest necessary path through a network of activities when respecting their interdependencies, which may be identified with the Program Evaluation and Review Technique and the Critical path method Critical… …   Wikipedia

Share the article and excerpts

Direct link
… Do a right-click on the link above
and select “Copy Link”